Make Construction Handoffs Verifiable

A purchase/change-order handoff specimen with offline evidence and delivery acknowledgement.

Back to Blog

Practical software guides

A construction handoff can create avoidable rework, but this guide makes no claim that it costs more than materials. Track one purchase or change order from the approved revision to actual receipt.

Fictional order CO-014
EventEvidence
Scope approvedExact drawing/specification revision
Supplier orderApproved quantity, price and delivery assumption
Change proposedSeparate revised approval; no silent overwrite
Site receiptReceived quantities and discrepancy photos
CloseoutQualified review of conformity and unresolved differences

A worker capturing receipt offline should see pending upload. Retain capture and server receipt times, and reconcile a repeated upload by stable reference. A delivery acknowledgement does not establish technical suitability or safety.

Use the existing project/accounting system where possible. Pilot only a narrow document or notification gap and define the acceptance check before development. Construction, code and warranty decisions require qualified specialists. See the project evidence guide for a material-substitution example.